Message from PHC today that the Backwater channel in Poole will be closed to all boat traffic on Friday 14th October from 0800 to 1800 or until work on new twin sails bridge is finished. (whichever is sooner).

 

There will be a 100m exclusion zone above & below the bridge workings.

  • 4 weeks later...
Posted

Next Bridge closures are scheduled as below

 

 

Mariners are advised that the Backwater channel will be closed to navigation for vessels that are

unable to proceed under the closed bridge spans due to their airdarft.

Navigation will remain open for low airdraft vessels that can safely proceed. Mariners

should proceed past the works at slow speed and keeping wash to a minimum.

It is intended to restrict the channel on Wednesday 16th November 2011 from 08:00hrs to

1800hrs, and Thursday 17th November 2011 from 0800hrs until 0800hrs on Friday 18th

November. The reopening of the channel will be promulgated by Poole Harbour Control on

VHF channel 14.

For further information contact

Join the conversation

You can post now and register later. If you have an account, sign in now to post with your account.

Guest
Reply to this topic...

×   Pasted as rich text.   Paste as plain text instead

  Only 75 emoji are allowed.

×   Your link has been automatically embedded.   Display as a link instead

×   Your previous content has been restored.   Clear editor

×   You cannot paste images directly. Upload or insert images from URL.

×
×
  • Create New...