Jump to content

Recommended Posts

Posted

Don't forget that from 15th Dec the Old Town Lifting Bridge will re-open (well may be :lol:  :lol: :lol:  :lol: ) 

 

If you are entering Poole Sea Angling Cod comp on the 17th Dec be aware you may have to allow more time!

 

 

Posted
The Bridge will be closed most of the time. When Coddy says re open it means it will lift/ re open at times shown in the Harbour Commissioner Notices to Mariners displayed on their website. This will allow vessels which have a high air draft to pass underneath. In my case, I need an air draft clearance of 1.70 meters with radar arch, aerial etc lowered.

Allan.
Posted

I don't understand, surely if the bridge is open then travel time will be shorter, why allowing extra time?


Re-opening to cars. i.e. Won't have at least one leaf permanently raised.

Join the conversation

You can post now and register later. If you have an account, sign in now to post with your account.

Guest
Reply to this topic...

×   Pasted as rich text.   Paste as plain text instead

  Only 75 emoji are allowed.

×   Your link has been automatically embedded.   Display as a link instead

×   Your previous content has been restored.   Clear editor

×   You cannot paste images directly. Upload or insert images from URL.

×
×
  • Create New...