New Bridge Sequence


Brian
 Share

Recommended Posts

From the BCP website

Poole Bridge will lift first regardless of the time of day.

Bridge lifting

After the first bridge lifts, the second bridge will open as soon as possible.

The first bridge will open again, if required, for returning vessels.

Until further notice, the lifting schedule of Poole Bridge and Twin Sails will be as per the schedule below.

Poole Bridge

5:30am

Poole Bridge

6:30am

Poole Bridge

7:30am

Poole Bridge

8:30am*

Poole Bridge

9:30am

Poole Bridge

10:30am

Poole Bridge

11:30am

Poole Bridge

12:30pm

Poole Bridge

1:30pm*

Poole Bridge

2:30pm

Poole Bridge

3:30pm

Poole Bridge

4:30pm

Poole Bridge

5:30pm*

Poole Bridge

6:30pm

Poole Bridge

7:30pm 

Poole Bridge

8:30pm*

Poole Bridge

9:30pm

Poole Bridge

10:30pm

Poole Bridge

11:30pm

 

* Weekends and bank holidays only

*Poole Bridge will lift first for all lifting cycles, Twin Sails opens immediately afterwards.

 

Link to comment
Share on other sites

  • Brian changed the title to New Bridge Sequence

 

Hang on a minute, let me try and understand this:-

 

Reading the above, if I was coming out of cobbs for the 07.30 bridges, Poole Old Town bridge will lift for incoming traffic at 07.30, then close and soon after the Twin Sales will lift. 

 

I then go into the basin and then the Twin Sales Bridge closes. Then soon after this Poole Old Town Bridge will Open to let me out......

 

Have I got this right????? 

 

Can anyone help me out here 😬

Link to comment
Share on other sites

17 hours ago, Greg said:

 

Hang on a minute, let me try and understand this:-

 

Reading the above, if I was coming out of cobbs for the 07.30 bridges, Poole Old Town bridge will lift for incoming traffic at 07.30, then close and soon after the Twin Sales will lift. 

 

I then go into the basin and then the Twin Sales Bridge closes. Then soon after this Poole Old Town Bridge will Open to let me out......

 

Have I got this right????? 

 

Can anyone help me out here 😬

I suspect that if no boats are waiting to come in they won`t lift old bridge first,

glad my boat goes under both bridges when down,all i need now is a space on F pontoon to be available.

boats just sitting on drive waiting.

Link to comment
Share on other sites

Join the conversation

You can post now and register later. If you have an account, sign in now to post with your account.

Guest
Reply to this topic...

×   Pasted as rich text.   Paste as plain text instead

  Only 75 emoji are allowed.

×   Your link has been automatically embedded.   Display as a link instead

×   Your previous content has been restored.   Clear editor

×   You cannot paste images directly. Upload or insert images from URL.

 Share

×
×
  • Create New...