The cable is going to come ashore at Taddiford.
I guess the sole fishing will be naff while work is ongoing .....
--------------------------------------------------------------------
Dear Sir/ Madam,
We are writing to inform you that Navitus Bay has revealed the location for the onshore underground cable route that would transfer power generated offshore from the proposed Navitus Bay offshore Wind Park into the national grid. The proposed wind park would generate enough clean energy to power up to 820,000 homes.*
The 35km underground route is proposed to run from the landfall point at Taddiford Gap, between Barton-on-Sea and Milford-on-Sea, to one of two substation locations close to West Moors and Three Legged Cross, near the Mannington grid connection. The two potential substation sites are being reviewed and the chosen site will be unveiled at public exhibitions in the autumn. The dates of these public exhibitions will be publicised on the Navitus Bay website in advance.
We have carefully evaluated the nature of the area, its environmental and engineering constraints and our specific technical requirements, and have consulted with landowners, local authorities and statutory nature conservation bodies about the proposals. We believe that the route we have chosen is the best possible option. Every effort has been taken to avoid sensitive sites and our continuing focus will be on minimising the environmental impact of the works.
The route would consist of cable circuits buried underground by opening individual trenches and laying cables, with a voltage nominally up to 275kV, either directly into the ground or into ducts at a depth of approximately 1.5m. When construction is complete, the trenches would be returned to their original state allowing access and farming to resume. In some cases the cables may be drilled underground.
The final design of Navitus Bay Wind Park will be determined only after comprehensive consultation with the public and relevant organisations throughout the formal consultation period of the project. This will last until the end of 2013.
If you would like more information about the cable route, future public exhibitions or the proposed Navitus Bay Wind Park, please visit our website at www.navitusbaywindpark.co.uk. Alternatively, you can contact us at either of the addresses below.
By post to: Navitus Bay, 3 Athena Court, Athena Drive, Tachbrook Park, Warwick CV34 6RT.
Or by email to: info@navitusbay.com
Kind regards,
Chris Sherrington