Adam will no doubt be along at some point to add to the update (most pics on his phone).
Yesterday after the booking if for the Open, I headed over to chez Franklin once again.
What a glorious day, not once did Adam or I envy those competitors out on the briney!!!!! [emoji22]
Anyway, JV won't build herself so:
I fitted the hand rails / over hang supports to the cabin / roof, fitted the new rod rack across the transom, with some help from Ad. Wired and mounted the shore power socket.
During this, Ad was fettling with window surrounds, flowcoating the toilet floor and sizing up the toilet seating position.
He / we also hung the toilet door, discussed latch options etc.
Then came the big 2 man job, laying the vinyl flooring!!
He had had issues finding anyone reliable to do this and the mention of "safety flooring" seemed to act as a deterrent!
So we thought, how hard can this be.
So, we made a template, drew it on the roll of flooring, cut it out (a few mil oversized all round) and tried it for size.
Funnily enough, it was a few mil too big, as expected, so a trim in place and it was looking good!
I then had to leave to head back to Cobbs for the photo finish / setup prize table etc etc.
Then in the evening, Jo and I met up with Adam and Rachel for dinner and theatre in Wimborne, needless to say, we had plenty to talk about still!